Skip to content
Fairview Semiconductor
Technical Research & Whitepapers

Architectural Insights & Frontier Silicon Diligence.

Architecture notes and commentary. Microarchitecture is in active development (formal freeze is our first Seed milestone). Shared MPW test-chip shuttle planned for Months 7–12 of the Seed round on TSMC 16nm FinFET via IC-Link by IMEC (aligned with C-DAC ChipIN Centre). Commercial Gen-1 targets TSMC 5nm FinFET baseline (under 350 W, air-cooled).

Distributed AI Systems, Pre-Training & Hardware Architecture•October 2026•7 min read

Scaling Frontier Model Pre-Training: Why 3Dx3D Glass Core Silicon Solves the 11 TB Optimizer Wall & MoE All-to-All Bottleneck

Frontier model pre-training chokes on the 11.2 TB AdamW optimizer wall and MoE All-to-All network saturation. An architectural breakdown of how 512 GB Gallium HBM4 sockets and the FV-Link 4.0 CPO-Ready roadmap (a Phase 2 target) address ZeRO-3 offload stalls.

#Frontier Pre-Training#11.2 TB Optimizer#FV-Link CPO-Ready (Phase 2 Target)#512 GB Gallium HBM4#Glass Core CTE#BSPDN Power
Fairview Architecture Team
Distributed Systems & Silicon Infrastructure
Read Whitepaper ›
Commentary · Not a datasheet•October 2026•6 min read

Reading FreeToken: The Residual Memory Problem, and the Stallion S10

FreeToken is other people’s software (arXiv:2608.16157). It does not run on Stallion today. A reading of q*, elastic cache, and checkpoints — then the residual on-prem memory problem and the intended S10 answer (Phase 1 MPW test coupon Months 7–12 · Gen-1 commercial target: TSMC 5nm FinFET).

#FreeToken commentary#arXiv:2608.16157#FinFET Target#On-prem inference#TARGET / NOT MEASURED
Fairview Semiconductor
Commentary
Read Whitepaper ›
Silicon Architecture & Systems Design•October 2026•10 min read

Inside the Stallion MPU: Programmable Systolic Compute

A deep dive into the 144 MEU topology, Backside Power Delivery (BSPDN), and why pureplay systolic MPUs outperform general-purpose GPUs without graphics die bloat or thermal IR voltage droop.

#5nm FinFET Gen-1 target#16nm MPW test vehicle#144 MEU Array#Systolic Tensor#4.72 PFLOPS#PULSE MLIR
Srikanth Rao
Founder & Chief Architect
Read Whitepaper ›
Hardware Architecture & Advanced Packaging•October 2026•12 min read

Breaking the Silicon Ceiling: Glass Core Substrates, Bumpless Hybrid Bonding, and the CPO-Ready Roadmap in the Post-GPU Era

The fundamental bottleneck of AI is no longer raw compute density—it is the Thermodynamic Triad. An in-depth architectural breakdown of how Glass Core Substrates, TSMC-SoIC Direct Cu-Cu Hybrid Bonding, Backside Power Delivery (BSPDN), and a CPO-ready glass substrate with a reserved waveguide path break the memory wall. Phase 1 electrical target is pre-silicon.

#Glass Substrates#Direct Cu-Cu Bonding#BSPDN#CPO-Ready (Phase 2)#5nm FinFET Gen-1 target#HBM4
Srikanth Rao
Founder & Chief Architect
Read Whitepaper ›

Upcoming Research Dispatches

Memory Subsystem Engineering•Coming Soon · Q4 2026

Deterministic Sub-8ns Micro-Arbiter Latency in 16,384-Bit HBM4 Memory Fabrics

How FairView’s hardware arbiter balances 32 concurrent pseudo-channels without bank conflicts or queue starvation under saturated multi-head attention traffic.

#HBM4#Micro-Arbiter#SECDED ECC#Logic MMU
Author: FairView Architecture Team
Systems & Software Co-Design•Coming Soon · Q4 2026

PULSEâ„¢ Runtime: Bypassing Host CPU SerDes Bottlenecks in Hyperscaler Clusters

A technical analysis of zero-copy CXL 3.1 memory pooling, Tokio async streaming, and Kubernetes Device Plugin orchestration across 512-MPU coherent domains.

#PULSE SDK#CXL 3.1#Kubernetes#Rust#Triton
Author: PULSE Software Engineering
All optical specs are design targets based on simulation / partner PDK — pending Tower / GlobalFoundries Fotonix / imec PIC MPW validation. Phase 1 target is electrical. Compute silicon is pre-production.
Blog: AI Silicon & Memory Wall | FairView Semiconductor