Electrical HBM4 + Stallion S10 MPU
Phase 1 — Electrical HBM4 and Stallion S10 MPU — CPO-ready glass interposer
Phase 1 is the electrical architecture target, and it is pre-silicon. Gallium HBM4 is designed to deliver 16.0 TB/s across the 16,384-bit aggregate bus to the Stallion S10 MPU over direct Cu-Cu hybrid bonding on a 3.2 ppm/K glass core substrate. The substrate layout reserves a laser-inscribed waveguide trench, so the Phase 2 optical unlock is a substrate and packaging evolution, not a re-architecture. No optical engine is present in the Phase 1 target.
- Gallium HBM4 co-designed memory subsystem — 16.0 TB/s target, 512 GB target capacity
- Stallion S10 MPU — TSMC FinFET compute (16nm shared MPW test vehicle planned for Months 7–12; Gen-1 commercial target 5nm FinFET; Gen-2 2nm GAAFET is Year 3+), TSMC-SoIC direct Cu-Cu hybrid bonding
- 3Dx3D glass core substrate, 3.2 ppm/K, CTE matched — laser-inscribed trench reserved for future 1550nm routing
- CPO-Ready glass interposer: waveguide trench and optical land reserved, not populated — bypasses copper SerDes heat by design
- Electrical attach is the Phase 1 target. Optical engines are not in this phase.