Electrical HBM4 + Stallion S10 MPU
Phase 1 Now-H2-27 — Electrical HBM4 + Stallion S10 MPU — MPW H1-27, Production H2-27 — CPO-Ready glass interposer
Phase 1 is the actual product. Gallium HBM4 delivers 16.0 TB/s across the 16,384-bit aggregate bus to the Stallion S10 MPU over direct Cu-Cu hybrid bonding on a 3.2 ppm/K glass core substrate. The same substrate ships with a laser-inscribed waveguide trench reserved in the layout — so the Phase 2 optical unlock is a substrate and packaging evolution, not a re-architecture. No optical engine is present in Phase 1 silicon.
- Gallium HBM4 co-designed memory subsystem — 16.0 TB/s target, 512 GB target capacity
- Stallion S10 MPU — 2nm-class GAAFET compute, TSMC-SoIC direct Cu-Cu hybrid bonding
- 3Dx3D glass core substrate, 3.2 ppm/K, CTE matched — laser-inscribed trench reserved for future 1550nm routing
- CPO-Ready glass interposer: waveguide trench and optical land reserved, not populated — bypasses copper SerDes heat by design
- MPW tape-out H1-27 · Production silicon H2-27 · Engineering-Ordered units 2028